Indicator F19B – selection of traffic before the charging station
Indicator F19B completes the road guidance systems and provides information on the distribution of traffic to categories of vehicles before access to the charging station.
Recommended for:
- motorways;
- toll stations;
- traffic control points;
- access areas with dedicated bands;
- Permanent signalling projects.
Benefits:
- rapid orientation to the appropriate band;
- efficient distribution of traffic;
- reduction of bottlenecks;
- increase the flow of circulation.
What Traffic Participants Need to Know
Indicator F19B indicate the bands dedicated to certain categories of vehicles before the charging station.
Traffic participants must track the signal and fall on the band for the category of which they are a member.
Construction and execution
Product manufactured for permanent road infrastructure:
- execution according to project;
- Custom configuration;
- adaptation to the number of lanes and vehicle categories;
- resistance for external use.
Mounting system
The indicator shall be carried out together with the fixing systems compatible with the solution provided for in the project.
The supporting metal structure shall be established separately.
Manufactured in accordance with STAS 1848/2024
Documentation available:
- EC type-approval;
- a declaration of conformity;
- Declaration of performance.
Commercial benefits
- Road sign F19B
- Project execution
- Customizable Configuration
- Adaptation after vehicle categories and location
- Permanent use
- Compatible with charging infrastructure
- Manufactured in accordance with STAS 1848/2024
See also:
Product categories
Road products
Services
FAQ
What does the F19B indicator indicate?
Indicator F19B indicates the distribution of traffic by vehicle categories before a charging station.
Does the indicator have standard dimensions?
No, no. The dimensions and configuration shall be determined according to the design and the number of bands.
Can you customize it?
Yeah. Vehicle categories and traffic organisation shall be determined in accordance with the project documentation.
Is the assembly structure included?
The support structure shall be established separately according to the technical solution.
Road guidance indicator F19B Selection of traffic by categories of vehicles near a charging station is used for the organisation of traffic and distribution of vehicles on dedicated bands prior to charging points. The dimensions and configuration of the indicator shall be determined in accordance with the requirements of each project and the location conditions, STAS 1848/2024.