Road signs temporary: U series explained for works
When the road narrows, a detour or an accident occurs, drivers need temporary road signs. The yellow background of the U series immediately shows that the displayed rule replaces the usual signal for a period of time. Chosen correctly, the set protects the drivers and the team.
In short: temporary U-series road signs warn, restrict speed or exceedance and drive traffic on the route of departure.
Do you need help choosing?
Tell us what you need and we'll send you the offer on the same working day.
A good set of temporary signs follows the driver's path: warning, gradual reduction of speed, prohibitions on the narrow sector, deviation and termination of restrictions. Mount the signs on mobile supports, complete the area with cones and keep the foil clean for reuse. On public roads, the succession shall establish the notified signalling project. Find all U series models in the category temporary indicators.
When a road narrows, a detour or an accident occurs, drivers need temporary road signs. They announce a situation that lasts hours, days or a few months. On Protrafic.ro, category temporary indicators includes 67 products of the U series. The guide below helps you to understand the codes and choose the right set.
What distinguishes temporary road signs from permanent ones
The permanent signs shall regulate long-term movement. Instead, temporary road signs signal a passing situation, such as a work or an incident. On the field, their yellow background makes them easy to recognize. At the same time, many of them re-emphasized the symbol of a permanent sign, but on the yellow background. Therefore, the driver immediately knows that the rule displayed replaces the usual rule for the time being.
Series U codes for temporary indicators
Warning: Dangerous narrowing and roadway
The first group warns of a danger. For example, sign U1 announces a narrow road on both sides. Then, U6 signal the long way, and U7 warns about the sprinkled rock. Model U1 and model U6 have, as described, the 900 mm side and the entry ‘Class 2'. So, these temporary road signs prepare the driver for a change of the carousel.
Restrictions: speed and exceedance
The second group imposes provisional rules. Indicator U13 introduces a limit of 30 km/h in the working area. Also, U12 prohibit overtaking of motor vehicles, except motorcycles without attachment. In other words, such temporary road signs reduce the risk to workers near the gang.
Deviations and incidents
Third group leads traffic on a new route. U16 signals temporary deviation, and U18 show the direction of bypass. In addition, U39 warns of a traffic accident in front of it. At the same time, these temporary road signs help to avoid blocking behind the affected area.
How to build a temporary road signs set
Only one sign rarely arrives. Usually, a working area requires a logical succession of signs:
- Warning, at sufficient distance before work.
- Gradual reduction of speed, by successive limits.
- Prohibition of overtaking in the narrow sector.
- Signaling the detour, if the band closes.
- Closing restrictions, after the work area.
Therefore, temporary road signs commands as set, not as isolated parts. The exact distances and the succession, however, sets out the signaling project, which the road manager and the road police are assisting.
Road signs temporary for urgent action
Not all situations are planned in time. For example, after an accident or a pipeline damage, the team should signal the area in a few minutes. In this case, it assists a self-sustained base set, i.e. warning of the U39 accident, a speed limit and deviation signs. Then, as the intervention continues, you complete the signal after police directions. Thus, temporary road signs prepared before shortening the time in which the area remains unsignalized.
Supports for temporary indicators
Temporary signs are on mobile supports, not on foundation pillars. For example, in the category positions for indicators You find the mobile pole and the tripod pole. In addition, on the strong wind, mobile supports need stabilization weights. Then, complete the area with steering cones and with signs in the category road signs works. Thus, temporary road signs and cones form a clear corridor for drivers.
Safety of the team that mounts the signs
The mounting of the signs itself is a moment of risk. First, the team cooks reflective equipment and works on the way. Then mount the signs in the order in which the driver meets them. In the end, they dismantle them in reverse order. For general rules of movement, please consult the information on: Romanian Police website. In short, road signs temporarily properly mounted protects both drivers and the team.
Frequent errors in temporary signalling
- Marks left on the stand after the work is done.
- Speed limits dropping suddenly, no intermediate steps.
- Panels overturned by the wind, because of the too light supports.
- Temporary signs that contradict the permanent signs that have been discovered.
On the other hand, the last situation creates the greatest confusion. Therefore, it covers permanent signs that contradict the new rule during the work. In the end, it immediately gathers temporary road signs after completion, so that the usual rule returns clearly.
How to keep temporary road signs for reuse
A major advantage of temporary signs is its reuse. After work, clean the dust and mud sheet. In addition, store the vertical panels so they don't scratch. Also, keep the signs on record, so you know what you have in stock at the next work. Then check the reflective sheet: if it has discolored or broken, replace the sign. Thus, well-maintained temporary road signs remain useful for many projects.
What you check before a new command
- Codes missing from the existing set.
- Signs with damaged foil, to be replaced.
- Number of support and stability weights.
- The requirements of the new signalling project.
Frequently Asked Questions about Temporary Indicators
What does "Class 2 " mean in the name of signs?
As a rule, the reference concerns the back-reflection class of the sheet. Therefore, the signal project tells you which class that road requires.
Can I use temporary road signs on a private road?
Yes, for example, on a factory platform. Use the same codes, because drivers recognize them easily.
Who determines what signs they put on a work?
Temporary signalling project, notified by road manager and police. So, without this opinion, don't start the work on the public road.
How long are the temporary signs on the road?
Just how long the situation that they're signaling. Then you squeeze them, because a forgotten sign loses its credibility.